| E28 − |
|
10 year guarantee*
*Full terms & conditions here |
|
BS EN 14516:2015+A1:2018 |
|
Overflow holes are predrilled. |
|
Supplied with bath feets. |
|
Tap holes can be drilled on site. |
|
Taps can be mounted on the ledge behind the overflow hole. |
|
The bath requires either bath panels or to be tiled in on site. |
| C9 - Bath Screen |
| W15 - Overflow bath filler single bath |
| W3 - Burlington bath overflow, plug and chain |
| SP231 | leg sets for Enviro, Sustain, EcoCurve, Verde, Reuse, Viride baths |
| SP705 | rectangular ABS block on the Cleargreen bath |
| SP704 | square ABS block on the Cleargreen bath |